Kings Copse Inclosure, Roughdown, Blackfield Data via plota.co.uk

26/01320SCR - Screening Opinion (EIA) Site Visit

Proposal

Application for screening opinion under Regulation 6 (schedule 2) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in respect of SSSI wetland restoration works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Nov 2026
✓
Validated
19 Nov 2026
Decision
Expected by 4 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 16 Dec 2026, from New Forest (Park)'s recent tree and landscaping works.

Site constraints 13

Surface water flood riskAerodrome safeguarding zoneFlood zone 3Flood zone 2Unexploded ordnance risk
Ancient woodland: East Stock Copse
Irreplaceable habitat. Standing advice asks for a 15 m buffer from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Special area of conservation: The New Forest
3 designations overlap here. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI: The New Forest SSSI
Natural England must be consulted on work that may affect it.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Habitat network: Ancient Semi Natural Woodland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Flood zone 3Council record
The council's own flood layer for this site.
Council site ↗
Flood zone 2Council record
The council's own flood layer for this site.
Council site ↗
Unexploded ordnance riskCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Screening Opinion (EIA)
Received
13 Nov 2026
Validated
19 Nov 2026
Parish
Beaulieu Parish Council, Denny Lodge Parish Council
Target decision
4 Dec 2026
Applicant
Show

Decision outlook

Day 4 of the 56-day target. New Forest (Park) usually decides tree and landscaping works by day 27.

Day 452 days to the 56-day target
100%decided within 8 weeks
100%approved
621decided in the last year

Plota live figures for tree and landscaping works decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 overall
Relevant to this application:
Householder decisions

New Forest (Park) is slower than most councils at deciding householder applications: #254 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026