NP/HPK/0725/0661 - Full Planning Permission Approved

Proposal

Demolition of existing building, removal of tennis court and erection of a new open market dwelling, garage, works of hard and soft landscaping and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Jul 2025
✓
Validated
7 Jul 2025
✓
Approved
13 Oct 2025

Approved on 13 Oct 2025 · Last checked 16 Oct 2026

Documents 24

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Public footpath about 7 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat about 11 m away: No main habitat but additional habitats present.
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area120 m² (1,292 sq ft)
Energy ratingD (65 out of 100), could reach C
PropertyMid-terrace house, 4 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
3 Jul 2025
Validated
7 Jul 2025
Parish
Thornhill
Case officer
Show
Decision
GRANTED CONDITIONALLY
Decision date
13 Oct 2025
Applicant
Show
Agent
Caroline McIntyre / Spring Planning Ltd

How this decision compares

Decided in 98 days from validation, 45 days slower than Peak District's median of 53 for full applications. Approved, as 84% of full applications here are.

64%decided within 8 weeks
84%approved
354decided in the last year

Plota live figures for full applications decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
9 Jul 2025
Comments by
30 Jul 2025
Statutory expiry
1 Sept 2025

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.