Land South of , Lichfield Road, Branston Data via plota.co.uk

P/2026/00945 - Discharge Of Condition Live

Proposal

Details required by condition 5 (Remediation scheme - Miller Homes Ltd - Phase 5) on Plots 15, 16, 17, 18, 19, 20 and 21 of planning permission relating to the application under Section 73 to vary Condition 1 (plans) attached to the Reserved Matters application for the erection of 100 dwellings including details of appearance, landscaping, layout and scale… Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
2 Sept 2026
Decision
Expected by 28 Oct 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 28 Oct 2026. Comments are open until 29 Sept 2026.

Comment on this application ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Local nature reserve 85 m away: Branston Water Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 2 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Staffordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Of Condition
Received
2 Sept 2026
Validated
2 Sept 2026
Ward
Branston
Parish
Branston CP
Case officer
Show
Target decision
28 Oct 2026
Decision level
Delegated
Applicant
Show

Consultation & key dates

Alt. reference
PP/2026/00928
Comments by
29 Sept 2026
Committee
2 Sept 2026
Statutory expiry
28 Oct 2026
Env. assessment
No
East Staffordshire
Planning Authority Score
2.6/10
Poor
#246 of 296 councils
Relevant to this application:
Major dwellings

East Staffordshire is one of the slowest councils in England for householder decisions, ranking #294 out of 296. The council extends the time limit on 70% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Staffordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #53 of 296
95%
Householder approved
Above avg (90%) #75 of 296
21%
Decided in 8 weeks
Below avg (63%) #294 of 296
70%
Extended time limit
Above avg (41%) #285 of 296
84%
Minor dwellings approved
57 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
80%
Change of use approved
50 decided
601
Total decisions
45 refused in the year to March 2026