Gatwick North Service Station, Longbridge Way, Gatwick, Crawley Data via plota.co.uk

CR/2026/0653/ADV - Advertisements Awaiting Decision

Proposal

Installation of internally illuminated 7-meter EV totem sign Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
Decision
Expected by 28 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Dec 2026 and 4 Jan 2027, from Crawley's recent signs and adverts.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Parts of the Urban District of Dorking · Land in the County of Surrey. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Gatwick Airport Northern Runway
The site is inside the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Public footpath about 23 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Inside the Hookwood built-up area; Priority habitat about 22 m away: Deciduous woodland; Air quality management area about 91 m away: AQMA No.3.
Not affected
Not green belt · No scheduled monument at the site

Checked on 12 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Crawley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Crawley
Application type
Advertisements
Received
2 Nov 2026
Validated
2 Nov 2026
Case officer
Show
Target decision
28 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
MBH Design Studio Ltd

Decision outlook

Day 17 of the 56-day target. Crawley usually decides signs and adverts by day 58.

Day 1741 days to the predicted decision (day 58)
48%decided within 8 weeks
87%approved
34decided in the last year

Plota live figures for signs and adverts decided by Crawley in the last twelve months, from validation. Crawley decision record →

Crawley
Planning Authority Score
0.5/10
Poor
#295 of 296 councils
Relevant to this application:
Other decisions

Crawley is one of the slowest councils in England for householder decisions, ranking #288 out of 296. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Crawley is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Crawley decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #235 of 296
82%
Householder approved
Below avg (90%) #265 of 296
26%
Decided in 8 weeks
Below avg (63%) #288 of 296
73%
Extended time limit
Above avg (41%) #290 of 296
80%
Minor dwellings approved
5 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
78%
Change of use approved
18 decided
218
Total decisions
38 refused in the year to March 2026