145a High Street Redcar TS10 3DQ Data via plota.co.uk

R/2025/0611/FF - Full Approved

Proposal

Proposed subdivision of flat to form 2no flats (first and second floor) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2025
✓
Validated
18 Sept 2025
✓
Approved
12 Feb 2026

Approved on 12 Feb 2026 · Last checked 12 Oct 2026

Site constraints 7

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Special protection area 61 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 62 m away: Teesmouth and Cleveland Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
3 listed buildings within 150 m
Nearest: No 151 (Clarendon House) and Area Railings, Grade II, 33 m away · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Also on the record
Nature recovery project: Tees Estuary Recovering Nature (TERN); Inside the Redcar built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area40 m² (431 sq ft)
Energy ratingB (asset rating 47)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in February 2026, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Redcar and Cleveland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
TS10 3DQ
Received
16 Sept 2025
Validated
18 Sept 2025
Case officer
Show
Decision
GRANT PLANNING PERMISSION
Decision date
12 Feb 2026
Applicant
Show
Agent
Pyramid Architectural Design

How this decision compares

Decided in 147 days from validation, 91 days slower than Redcar and Cleveland's median of 56 for full applications. Approved, as 95% of full applications here are.

58%decided within 8 weeks
95%approved
9%go to committee

Plota live figures for full applications decided by Redcar and Cleveland in the last twelve months, from validation. Redcar and Cleveland decision record →

Consultation & key dates

Consultation
18 Sept 2025
Comments by
17 Oct 2025
Redcar and Cleveland
Planning Authority Score
6.8/10
Good
#69 of 296 overall
Relevant to this application:
Householder decisions

Redcar and Cleveland is #169 of 296 councils on householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #15 of 296
96%
Householder approved
Above avg (90%) #58 of 296
62%
Decided in 8 weeks
Below avg (63%) #169 of 296
30%
Extended time limit
Below avg (41%) #56 of 296
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
418
Total decisions
16 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use