The Plimsoll Line 138-142 High Street Redcar TS10 3DH Data via plota.co.uk

R/2026/0708/FF - Full Valid

Proposal

Replacement of existing timber doors at rear with aluminium doors and glazed panels above Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Sept 2026
Decision
Expected by 18 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 17 Nov 2026, from Redcar and Cleveland's recent extensions. Comments are open until 20 Oct 2026.

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Special protection area about 118 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 118 m away: Teesmouth and Cleveland Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
2 listed buildings within 150 m of the postcode pin; Nature recovery project: Tees Estuary Recovering Nature (TERN); Inside the Redcar built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 29 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redcar and Cleveland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
TS10 3DH
Received
23 Sept 2026
Validated
23 Sept 2026
Case officer
Show
Decision level
Sch 2
Applicant
Show
Agent
Harrison Ince Architects Ltd

Decision outlook

Day 12 of the 56-day target. Redcar and Cleveland usually decides extensions by day 55.

Day 1244 days to the 56-day target
75%decided within 8 weeks
95%approved
149decided in the last year

Plota live figures for extensions decided by Redcar and Cleveland in the last twelve months, from validation. Redcar and Cleveland decision record →

Consultation & key dates

Consultation
29 Sept 2026
Comments by
20 Oct 2026
Redcar and Cleveland
Planning Authority Score
6.8/10
Good
#69 of 296 councils
Relevant to this application:
Householder decisions

Redcar and Cleveland ranks #169 out of 296 councils for householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #15 of 296
96%
Householder approved
Above avg (90%) #58 of 296
62%
Decided in 8 weeks
Below avg (63%) #169 of 296
30%
Extended time limit
Below avg (41%) #56 of 296
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
418
Total decisions
16 refused in the year to March 2026