70 Northgate Canterbury Kent CT1 1BB Data via plota.co.uk

CA/26/01243 - SOD Planning Permission Approved

Proposal

Details submitted pursuant to Condition 3 (method for paint removal), Condition 4 (windows and doors), Condition 6 (Fire Doors), Condition 7 (ventilation, extraction and associated pipework) and Condition 8 (Structural Engineers Statement) of listed building consent CA/25/02141 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jul 2026
✓
Approved
15 Sept 2026

Approved on 15 Sept 2026 · Delegated Decision · Last checked 16 Sept 2026

Associated applications 3

Site constraints 12

Grade II listed: 70 and 71, Northgate
List entry 1241068 · The pin is inside its outline · 95 more listed buildings within 150 m (3 Grade I, 5 Grade II*, 78 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 95 with distances
Historic England ↗
Nutrient neutrality catchment: Stodmarsh SAC/SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
CANTERBURY CITY (Canterbury Conservation Area) Reg 4.12.96 conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Canterbury and surrounding area. Dated 25.02.2015 effective 25.02.2016. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Scheduled monument 32 m away: Canterbury city walls
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Local nature reserve 181 m away: Bus Company Island
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
World heritage site 39 m away: Canterbury Cathedral, St. Augustine's Abbey and St. Martin's Church
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
National infrastructure project 874 m away: Richborough Connection Project
The site is 874 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Heritage at risk 64 m away: Monuments in the precinct of Canterbury Cathedral, The Precinct, Canterbury; Inside the Canterbury built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £317,500 in October 2021. Other property, freehold.

29 October 2021£317,500Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area68 m² (732 sq ft)
Energy ratingE (asset rating 109)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2023, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Canterbury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Canterbury
Application type
SOD Planning Permission
Postcode
CT1 1BB
Received
22 Jul 2026
Validated
22 Jul 2026
Ward
Northgate
Case officer
Show
Target decision
16 Sept 2026
Decision
Approved
Decision date
15 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
James Clague Architects

Public comments

No public comments yet.

Last counted 16 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
16 Sept 2026
Canterbury
Planning Authority Score
4.8/10
Below average
#158 of 296 overall
Relevant to this application:
Householder decisions

Canterbury is slower than most councils at deciding householder applications: #259 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Canterbury decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #18 of 296
97%
Householder approved
Above avg (90%) #27 of 296
43%
Decided in 8 weeks
Below avg (63%) #259 of 296
44%
Extended time limit
Above avg (41%) #176 of 296
84%
Minor dwellings approved
62 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
93%
Change of use approved
29 decided
925
Total decisions
45 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.