Station Hotel Morton Crescent Fence Houses Houghton-le-Spring DH4 6AD Data via plota.co.uk

25/02855/CAA - Consultation with Adjoining Authority Decided

Proposal

Demolition of existing buildings and construction of two new retail units with associated car parking, landscaping and access. (Amendments received) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Dec 2025
✓
Consultation
18 Dec 2025
Decision
Target date was 30 Dec 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 349.

The consultation period closed on 8 Jan 2026.

Site constraints 5

Recorded mine shaft about 39 m from the postcode pin
Reference 431550-009. Building over or close to a mine entry should be avoided, even once it is capped.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
Radon affected area, class 2; 1 listed building within 150 m of the postcode pin; Inside the Fence Houses built-up area; Green belt about 47 m away: Tyne and Wear.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £300,000 in April 2026. Other property, freehold.

15 April 2026£300,000Recorded as a transfer outside a standard sale
22 March 2019£160,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Sunderland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sunderland
Application type
Consultation with Adjoining Authority
Postcode
DH4 6AD
Received
9 Dec 2025
Validated
9 Dec 2025
Case officer
Show
Target decision
30 Dec 2025
Decision level
Delegated Decision
Applicant
Show
Freehold owner
Show

Decision outlook

Day 349, past the statutory target. 100% of other in Sunderland are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 349293 days past the 56-day target
71%decided within 8 weeks
86%approved
20%go to committee

Plota live figures for other decided by Sunderland in the last twelve months, from validation. Sunderland decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
18 Dec 2025
Comments by
8 Jan 2026
Statutory expiry
30 Dec 2025
Env. assessment
No
Sunderland
Planning Authority Score
6.2/10
Average
#94 of 296 overall
Relevant to this application:
Householder decisions

Sunderland is #99 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sunderland decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #101 of 296
94%
Householder approved
Above avg (90%) #119 of 296
73%
Decided in 8 weeks
Above avg (63%) #99 of 296
37%
Extended time limit
Below avg (41%) #123 of 296
85%
Minor dwellings approved
34 decided (1-9 homes)
84%
Major dwellings approved
19 decided (10+ homes)
66%
Change of use approved
58 decided
581
Total decisions
54 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.