1 Pondwicks Close St Albans Hertfordshire AL1 1DG Data via plota.co.uk

TP/2026/0453 - TCA Approved

Proposal

Willow - Pollard due to limb failure Data via plota.co.uk

View original council record ↗Last checked

St Albans City and District Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Approved
3 Sept 2026
✓
Received
13 Sept 2026
✓
Validated
14 Sept 2026

Approved on 3 Sept 2026 · Delegated Decision · Last checked 26 Oct 2026

Site constraints 9

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
St Albans - The Park and St Stephens Hill conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Scheduled monument 100 m away: St Albans Abbey, site of conventual buildings
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; Flood defence 25 m away (natural high ground, designed for a 1 in 5 year flood); 1 listed building within 150 m; Inside the St Albans built-up area; Green belt 37 m away: London.

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in St Albans - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
St Albans
Application type
TCA
Postcode
AL1 1DG
Received
13 Sept 2026
Validated
14 Sept 2026
Ward
Verulam
Case officer
Show
Target decision
25 Oct 2026
Decision
Treeworks Deemed Consent
Decision date
3 Sept 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in -10 days from validation, 53 days faster than St Albans's median of 43 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

93%decided within 8 weeks
99%approved
573decided in the last year

Plota live figures for tree and landscaping works decided by St Albans in the last twelve months, from validation. St Albans decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
323800PLN
Planning Portal ref
15222383
Comments by
5 Oct 2026
Statutory expiry
25 Oct 2026
Env. assessment
No
St Albans
Planning Authority Score
1.1/10
Poor
#290 of 296 overall
Relevant to this application:
Householder decisions

St Albans is one of the slowest councils in England for householder decisions: #285 of 296 on speed. The council extends the time limit on 64% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
St Albans decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #180 of 296
88%
Householder approved
Below avg (90%) #226 of 296
29%
Decided in 8 weeks
Below avg (63%) #285 of 296
64%
Extended time limit
Above avg (41%) #278 of 296
74%
Minor dwellings approved
130 decided (1-9 homes)
61%
Major dwellings approved
18 decided (10+ homes)
77%
Change of use approved
26 decided
1,411
Total decisions
184 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use