Land near 1 Schallenge Walk Bromyard Herefordshire HR7 4DR Data via plota.co.uk

P253425/K - Works to Trees in a Conservation Area Approved

Proposal

T1 Cherry - Crown lift to provide 3m clearance from ground level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Nov 2025
✓
Approved
6 Jan 2026

Approved on 6 Jan 2026 · Last checked 14 Oct 2026

Site constraints 5

Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Public footpath 17 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
48 listed buildings within 150 m
Nearest: Almshouses, Grade II, 51 m away · 1 Grade I, 1 Grade II*, 46 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 48 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; Inside the Bromyard built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Trees in a Conservation Area
Postcode
HR7 4DR
Received
27 Nov 2025
Validated
27 Nov 2025
Ward
Bromyard Bringsty
Parish
Bromyard and Winslow
Target decision
8 Jan 2026
Decision
Trees in Cons Area Works Can Proceed
Decision date
6 Jan 2026

How this decision compares

Decided in 40 days from validation, about the council's usual 37 days. Approved, as 95% of tree and landscaping works here are.

96%decided within 8 weeks
95%approved
502decided in the last year

Plota live figures for tree and landscaping works decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Consultation & key dates

Consultation
3 Dec 2025
Comments by
24 Dec 2025
Site or press notice
3 Dec 2025
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 overall
Relevant to this application:
Other decisions

Herefordshire is slower than most councils at deciding householder applications: #250 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026