11 Broad Lane Moulton Spalding PE12 6PN Data via plota.co.uk

H13-0854-26 Undecided

Proposal

Works to Trees in Moulton Conservation Area Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
Decision
Expected by 20 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 20 Oct 2026, from South Holland's recent tree and landscaping works.

Site constraints 3

Also on the record
National infrastructure project about 1959 m away: Meridian Solar Farm; Inside the Moulton (South Holland) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £610,000 in February 2022. Detached house, freehold.

16 February 2022£610,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area235 m² (2,530 sq ft)
Energy ratingC (71 out of 100)
PropertyDetached house, 9 habitable rooms
Built1991 to 1995
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in August 2021, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in South Holland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
PE12 6PN
Received
8 Sept 2026
Validated
8 Sept 2026
Parish
Moulton
Case officer
Show
Target decision
20 Oct 2026
Applicant
Show
Agent
East Coast Access

Decision outlook

Day 31 of the 56-day target. South Holland usually decides tree and landscaping works by day 42.

Day 3125 days to the 56-day target
95%decided within 8 weeks
100%approved
65decided in the last year

Plota live figures for tree and landscaping works decided by South Holland in the last twelve months, from validation. South Holland decision record →

South Holland
Planning Authority Score
3.6/10
Below average
#216 of 296 councils
Relevant to this application:
Householder decisions

South Holland ranks #170 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Holland decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #260 of 296
89%
Householder approved
Below avg (90%) #210 of 296
62%
Decided in 8 weeks
Below avg (63%) #170 of 296
44%
Extended time limit
Above avg (41%) #185 of 296
63%
Minor dwellings approved
156 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
67%
Change of use approved
12 decided
607
Total decisions
119 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.