Trafalgar Tavern, Park Row, Greenwich, London, SE10 9NW Data via plota.co.uk

25/4187/SD - Submission of Details 8 Weeks Approved

Proposal

Submission of details pursuant to discharge the relevant condition as required in section 61 [Management Plan] of planning appeal reference APP/ dated 24/09/2025. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Dec 2025
✓
Consultation
5 Jan 2026
✓
Approved
28 Aug 2026

Approved on 28 Aug 2026 · Delegation · Last checked 7 Oct 2026

Site constraints 16

Grade II listed: The Trafalgar Tavern
List entry 1078950 · 1 m away · 15 more listed buildings within 150 m (2 Grade I, 13 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 15 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
World heritage site: Maritime Greenwich
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Blackheath conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1.2 km); London Strategic Heat Main Project (at pre-application, 115 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Thames Path 10 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Scheduled monument 24 m away: Greenwich Palace
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 2; Flood defence 8 m away (wall, designed for a 1 in 1000 year flood); Priority habitat 8 m away: Mudflats; Inside the Greenwich built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Metropolitan Open Land 24 m away; Town centre 17 m away: Greenwich West.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area3,655 m² (39,342 sq ft)
Energy ratingD (asset rating 86)
UseA3/A4/A5 Restaurant and Cafes/Drinking Establishments and Hot Food takeaways
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in June 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Submission of Details 8 Weeks
Postcode
SE10 9NW
Received
15 Dec 2025
Validated
15 Dec 2025
Ward
EAST GREENWICH
Parish
Greenwich
Case officer
Show
Target decision
9 Feb 2026
Decision
Approve
Decision date
28 Aug 2026
Decision level
Delegation
Applicant
Show
Agent
Russell Associates Architects
Leaseholder
Show

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14561210
Planning Portal ref
PP-14561210
Consultation
5 Jan 2026
Statutory expiry
9 Feb 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 overall
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications: #76 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.