Cabot Gate Newfoundland Circus Bristol BS2 9AB Data via plota.co.uk

25/12894/SCR - Screening Opinion Decided

Proposal

Request for a Screening Opinion as to whether an Environmental Impact Assessment is required for the redevelopment to provide up to 500 student beds and Class E use(s) on the western half in a building of up to 28 storeys, and either up to 200 student beds or a 150 room hotel or 150 co-living beds and community use(s) (Class E/F2) on the eastern half in a building of up to 12 storeys. (Please note that this is not a planning application and therefore we are not carrying out public consultation on the proposal at this stage) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jul 2025
✓
EIA Not required
29 Sept 2025

EIA Not required on 29 Sept 2025 · Delegated Decision · Last checked 9 Nov 2026

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Ashley Ward, Cabot Ward, Clifton East Ward, Cotham Ward and Lawrence Hill Ward (1999 ward boundary). Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Bristol AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Coalfield, development low risk area; 2 listed buildings within 150 m of the postcode pin; Inside the Bristol built-up area; Conservation area about 94 m away: Portland and Brunswick Square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 8 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Screening Opinion
Postcode
BS2 9AB
Received
1 Jul 2025
Validated
1 Jul 2025
Ward
Lawrence Hill
Parish
Ashley, Easton And Lawrence Hill
Target decision
22 Jul 2025
Decision
EIA Not required
Decision date
29 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Savills (UK) Limited

Public comments

No public comments yet.

Last counted 9 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
16 Jul 2025
Statutory expiry
22 Jul 2025
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 councils
Relevant to this application:
Householder decisions

Bristol ranks #112 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026