Ntt House 2 Waterfront Business Park Fleet Hampshire GU51 3QT Data via plota.co.uk

26/01896/FUL - Full Application Registered

Proposal

Erection of a cycle store and a refuse store Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
✓
Validated
17 Nov 2026
Decision
Expected by 12 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 11 Jan 2027, from Hart's recent extensions.

Site constraints 6

Local nature reserve 24 m away: Fleet Pond
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 24 m away: Fleet Pond SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Flood defence 24 m away (natural high ground, designed for a 1 in 5 year flood); Inside the Fleet built-up area; Priority habitat 23 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hart - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hart
Application type
Full Application
Postcode
GU51 3QT
Received
4 Nov 2026
Validated
17 Nov 2026
Ward
Fleet East Ward
Parish
Fleet Parish
Target decision
12 Jan 2027
Applicant
Show
Agent
Danks Badnell Architects Ltd.

Decision outlook

Day 6 of the 56-day target. Hart usually decides extensions by day 55.

Day 650 days to the 56-day target
72%decided within 8 weeks
90%approved
466decided in the last year

Plota live figures for extensions decided by Hart in the last twelve months, from validation. Hart decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15345525
Planning Portal ref
PP-15345525
Statutory expiry
12 Jan 2027
Env. assessment
No
Hart
Planning Authority Score
4.7/10
Below average
#165 of 296 overall
Relevant to this application:
Householder decisions

Hart is #116 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hart decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #223 of 296
86%
Householder approved
Below avg (90%) #244 of 296
71%
Decided in 8 weeks
Above avg (63%) #116 of 296
36%
Extended time limit
Below avg (41%) #111 of 296
64%
Minor dwellings approved
45 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
81%
Change of use approved
16 decided
698
Total decisions
114 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use