TWC/2026/0231 - Full Planning Approved

Proposal

Erection of a side extension to existing industrial unit Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Mar 2026
✓
Approved
14 Aug 2026

Approved on 14 Aug 2026 · Delegated · Last checked 11 Sept 2026

Site constraints 4

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Local nature reserve about 277 m away: Randlay Valley
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Coalfield, development low risk area; Inside the Telford built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Telford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Telford
Application type
Full Planning
Postcode
TF3 3BS
Received
31 Mar 2026
Validated
31 Mar 2026
Ward
The Nedge
Parish
Hollinswood and Randlay
Case officer
Show
Decision
Full Granted
Decision date
14 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
Base Architects

How this decision compares

Decided in 136 days from validation, 91 days slower than Telford's median of 45 for commercial premises. Approved, as 94% of commercial premises here are.

87%decided within 8 weeks
94%approved
93decided in the last year

Plota live figures for commercial premises decided by Telford in the last twelve months, from validation. Telford decision record →

Consultation & key dates

Planning Portal ref
14239647
Telford
Planning Authority Score
7.8/10
Good
#31 of 296 overall
Relevant to this application:
Householder decisions

Telford is one of the fastest councils in England for householder decisions: #6 of 296 on speed. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Telford decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #102 of 296
91%
Householder approved
Above avg (90%) #183 of 296
96%
Decided in 8 weeks
Above avg (63%) #6 of 296
12%
Extended time limit
Below avg (41%) #6 of 296
77%
Minor dwellings approved
57 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
86%
Change of use approved
43 decided
571
Total decisions
54 refused in the year to March 2026