STREET RECORD Oak Tree Close, Rowlands Castle, Hampshire Data via plota.co.uk

EHDC-26-1247-TPO - Tree Preservation Order Under Consultation

Proposal

T8, T9,T10 3 x Pedunculate Oak trees and 1 x large oak within Group G2 all require the pruning of dead and die back low hanging branches. Additionally a low hanging damaged branch spanning the pavilion foot path T9 T10 - Pedunculate Oak • shows signs of dieback in the crown. cleaning out the crown of all deadwood and dieback. • Remove all deadwood and dieback. T8, T9 and T10 - Pedunculate Oaks all show signs of dieback in the crown - clean out the crown of all deadwood and dieback appearance. • Remove all deadwood and dieback - T9 - Remove the lowest branch above the gravel path for safety reasons. Group G2 - Pedunculate Oak - The one small basal cavity is not significant at this juncture and shows only very minor signs of dieback in the crown. • Remove all deadwood and dieback - for safety reasons. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Dec 2026 and 13 Jan 2027, from East Hampshire's recent tree and landscaping works.

Comments are open until 2 Dec 2026

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 236 m away: Hampshire Water Transfer and Water Recycling Project
The site is 236 m from the project boundary. Dam or reservoir, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Registered park or garden 213 m away: Leigh Park (Staunton Country Park); Inside the Rowlands Castle built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Received
4 Nov 2026
Validated
4 Nov 2026
Ward
Rowlands Castle
Parish
Rowlands Castle CP
Case officer
Show
Target decision
30 Dec 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 19 of the 56-day target. East Hampshire usually decides tree and landscaping works by day 60.

Day 1941 days to the predicted decision (day 60)
44%decided within 8 weeks
95%approved
323decided in the last year

Plota live figures for tree and landscaping works decided by East Hampshire in the last twelve months, from validation. East Hampshire decision record →

Consultation & key dates

Comments by
2 Dec 2026
Statutory expiry
30 Dec 2026
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 overall
Relevant to this application:
Householder decisions

East Hampshire is one of the slowest councils in England for householder decisions: #293 of 296 on speed. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026