Tesco Esso Express 355 - 363 Uxbridge Road Acton W3 9RH Data via plota.co.uk

262948CND - Discharge Condition Pending Consideration

Proposal

Details of internal and externally located machinery, plant and equipment/ extraction/ ventilation system and ducting at the development shall be mounted with proprietary anti-vibration isolators and fan motors pursuant to condition 5 of planning permission ref: 254229FUL dated 28.01.2026 for: Single storey warehouse extension (following demolition of existing open-air warehouse/storage area); and relocation of existing AC units along the rear elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Jul 2026
✓
Consultation
29 Jul 2026
Decision
Expected by 31 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 95.

The consultation period closed on 12 Aug 2026.

Associated applications 3

  • Part of

    FullApprovedcouncil archive

    Conditions 4, 5 awaiting decision

Site constraints 7

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Conservation area 23 m away: Creffield
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
National infrastructure project 1441 m away: Thames Tideway Tunnel; Inside the Ealing built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 32 m away; Priority habitat 38 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Discharge Condition
Postcode
W3 9RH
Received
6 Jul 2026
Validated
6 Jul 2026
Ward
North Acton
Case officer
Show
Target decision
31 Aug 2026
Applicant
Show
Agent
HLN Ltd

Decision outlook

Day 95, past the statutory target. 76% of commercial and major works in Ealing are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 9539 days past the 56-day target
45%decided within 8 weeks
90%approved
61decided in the last year

Plota live figures for commercial and major works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14859013
Planning Portal ref
PP-14859013
Consultation
29 Jul 2026
Comments by
12 Aug 2026
Statutory expiry
31 Aug 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026