Rosslyn House, West Street, Dormansland, Lingfield, Surrey, RH7 6QR Data via plota.co.uk

2026/1434/TPO Pending

Proposal

T1- Oak to be remove due to a heavy lean over the main parking area. G1- 3x conifer to be removed which are growing through the crown in a neighbour oak, this is to benifit the oak they are growing in to. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 23 Dec 2026 and 30 Dec 2026, from Tandridge's recent tree and landscaping works.

Comments are open until 6 Dec 2026

Comment on this application ↗

Site constraints 6

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Also on the record
1 listed building within 150 m of the postcode pin; National landscape about 418 m away: High Weald; Inside the Dormansland built-up area; Tree preservation order about 22 m away: Nos. 2, 5, 6, 8, 9 & 11 Kinnibrugh Drive, Dormansland Rh7 6qf & Rosslyn House, West Street, Dormansland Rh7 6qr; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tandridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tandridge
Postcode
RH7 6QR
Received
12 Nov 2026
Validated
12 Nov 2026
Parish
Dormansland
Target decision
4 Jan 2027

Decision outlook

Day 11 of the 56-day target. Tandridge usually decides tree and landscaping works by day 44.

Day 1145 days to the 56-day target
93%decided within 8 weeks
96%approved
207decided in the last year

Plota live figures for tree and landscaping works decided by Tandridge in the last twelve months, from validation. Tandridge decision record →

Consultation & key dates

Comments by
6 Dec 2026
Tandridge
Planning Authority Score
2.3/10
Poor
#264 of 296 overall
Relevant to this application:
Householder decisions

Tandridge is slower than most councils at deciding householder applications: #234 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Tandridge decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #228 of 296
90%
Householder approved
Above avg (90%) #196 of 296
51%
Decided in 8 weeks
Below avg (63%) #234 of 296
56%
Extended time limit
Above avg (41%) #255 of 296
68%
Minor dwellings approved
122 decided (1-9 homes)
47%
Major dwellings approved
17 decided (10+ homes)
75%
Change of use approved
8 decided
701
Total decisions
113 refused in the year to March 2026