Land at the Former Barry Power Station, Sully Moors Road, Barry Data via plota.co.uk

2025/00807/FUL - Full Planning Application Approved

Proposal

Construction and operation of a 50MW long duration energy storage facility with associated equipment, access, drainage, infrastructure and engineering works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2025
✓
Approved
13 Feb 2026

Approved on 13 Feb 2026 · Committee · Last checked 15 Oct 2026

Planning committee

Decided by Glamorgan Planning Committee on 12 Feb 2026.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • The application sought permission for a 50MW long duration energy storage facility with associated infrastructure.
  • Planning permission was approved subject to conditions.
  • Conditions covered ecology, contamination, construction traffic, noise and protecting a water main near the site.
Read how the committee decided The proposal and the conditions attached to approval.

Source: Plota analysis of Glamorgan's committee minutes of 12 Feb 2026.

Documents 56

Other documents 23

PDF Approved Final Report Approved Details · 13 Feb 2026 View ↗ PDF APPROVED Revised_NIA_Oct 2025.pdf Approved Details · 15 Oct 2025 View ↗ PDF Site Notice_202500807FUL.docx Site Notice · 10 Sept 2025 View ↗ PDF The Glamorgan Star Advert 4 Sept Edition Press Advert · 8 Sept 2025 View ↗ PDF Applicationformredacted Forms · 7 Aug 2025 View ↗ PDF 250723 Cover Ltr redacted Supporting Documents · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 2 · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 3 · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 4 · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 5 · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 6 · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 7 · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 8 · 7 Aug 2025 View ↗ PDF Supporting Documents Phase 1 Esa Part 9 · 7 Aug 2025 View ↗ PDF Phase 1 Esa Part 10 Redacted Supporting Documents · 7 Aug 2025 View ↗ PDF Phase 1 Esa Part 11 Redacted Supporting Documents · 7 Aug 2025 View ↗ PDF APPROVED Lvis Part 1 Approved Details · 7 Aug 2025 View ↗ PDF APPROVED Lvis Part 2 Approved Details · 7 Aug 2025 View ↗ PDF APPROVED Lvis Part 3 Approved Details · 7 Aug 2025 View ↗ PDF APPROVED Lvis Part 4 Approved Details · 7 Aug 2025 View ↗ PDF APPROVED 250806 Pac Report (final) Redacted Approved Details · 7 Aug 2025 View ↗ PDF APPROVED Phase 1 Esa Part 1 Redacted Approved Details · 7 Aug 2025 View ↗ PDF APPROVED Puq Jba Xx Xx Rp Z 0001 S3 P05 Sully Moors Lane Fca Approved Details · 7 Aug 2025 View ↗

All documents on the council site ↗

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 3.
Not affected
No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for battery storage?

Plota Sites searches every land parcel in England and Wales: 9,119 sites fit this search. On and off the market, free to search.

Land for battery storage
Work with planning data?

Every application in Glamorgan - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Glamorgan
Application type
Full Planning Application
Received
7 Aug 2025
Validated
7 Aug 2025
Ward
Sully
Parish
Sully Community Council
Case officer
Show
Target decision
2 Oct 2025
Decision
Approved
Decision date
13 Feb 2026
Decision level
Committee
Applicant
Show
Agent
CarneySweeney

How this decision compares

Decided in 190 days from validation, 126 days slower than Glamorgan's median of 64 for full applications. Approved, as 90% of full applications here are.

40%decided within 8 weeks
90%approved
640decided in the last year

Plota live figures for full applications decided by Glamorgan in the last twelve months, from validation. Glamorgan decision record →

Consultation & key dates

Comments by
25 Sept 2025
Committee
12 Feb 2026