25 Kennedy Way Immingham North East Lincolnshire DN40 2AB Data via plota.co.uk

DM/0723/25/FUL - Full Application Approved

Proposal

Change of use from existing shop to hot food takeaway to include installation of air conditioning units, extraction and ventilation equipment to rear. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 15 Aug 2025
✓
Consultation
22 Aug 2025
✓
Approved
10 Nov 2025

Approved on 10 Nov 2025 · Committee · Last checked 14 Oct 2026

Planning committee

Decided by North East Lincs Planning Committee on 29 Oct 2025.

Approved

As officers recommended.

  • Officers advised approval because the town-centre proposal would not harm character, residential amenity, highways or flooding interests.
  • The Town Council objected over the school’s proximity, healthy eating, antisocial behaviour, litter, noise, odour and deliveries; other consultees raised no objection.
  • The application was approved with conditions, with the decision delegated after additional publicity and no significant planning issues.
Read how the committee decided The proposal, site, officers’ assessment, objections, consultation responses, conditions and decision.

Source: Plota analysis of North East Lincs's committee minutes of 29 Oct 2025.

Documents 40

All documents on the council site ↗

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 1055 m away: Immingham Green Energy Terminal
The site is 1055 m from the project boundary. Harbour, decided. The project page says whether consent was granted. Also within 2 km: Viking CCS Pipeline (decided, 1185 m); Immingham Eastern Ro-Ro Terminal (decided, 1261 m); VPI Immingham OCGT (decided, 1627 m); Hornsea Offshore Wind Farm (Zone 4) - Project Two (decided, 1763 m); Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 1763 m); A160 - A180 Port of Immingham Improvement (decided, 1957 m); H2East Pipeline: Humber to Nottinghamshire (at pre-application, 238 m); Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, 768 m); Humber Carbon Capture Pipeline (at pre-application, 1922 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Immingham built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area140 m² (1,507 sq ft)
Energy ratingB (asset rating 46)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
DN40 2AB
Received
around 15 Aug 2025
Validated
15 Aug 2025
Ward
Immingham
Parish
Immingham Town Council
Case officer
Show
Target decision
12 Nov 2025
Decision
Approved with Conditions
Decision date
10 Nov 2025
Decision level
Committee
Applicant
Show
Agent
Pegasus Planning Group Ltd
Leaseholder
Show

How this decision compares

Decided in 87 days from validation, 31 days slower than North East Lincs's median of 56 for full applications. Approved, as 94% of full applications here are.

53%decided within 8 weeks
94%approved
11%go to committee

Plota live figures for full applications decided by North East Lincs in the last twelve months, from validation. North East Lincs decision record →

Public comments

No public comments yet.

89 neighbours consulted · Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14213480
Planning Portal ref
PP-14213480
Consultation
22 Aug 2025
Comments by
8 Nov 2025
Site or press notice
15 Oct 2025
Committee
29 Oct 2025
Statutory expiry
10 Oct 2025
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Change of use

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.