19, Taryn Drive, Darlaston, Wednesbury, WS10 8XY Data via plota.co.uk

26/0999 - Full Application Under Consultation and Assessment

Proposal

Full planning application for a single storey rear extension (affects the setting of public right of way: DAR19). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Sept 2026
Decision
Target date was 20 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Walsall's recent extensions.

The consultation period closed on 22 Oct 2026.

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: 42 m away (reference 397297-084).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Public footpath 16 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Birmingham and the Black Country; Inside the Darlaston built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £252,000 in December 2019. Detached house, freehold.

19 December 2019£252,000
10 September 2003£144,000
21 June 1996£78,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area142 m² (1,528 sq ft)
Energy ratingE (54 out of 100), could reach C
PropertyDetached house, 5 habitable rooms
Built1976 to 1982
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, partial insulation (assumed)

From the energy performance certificate lodged in December 2013, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Full Application
Postcode
WS10 8XY
Received
25 Sept 2026
Validated
25 Sept 2026
Ward
Bentley & Darlaston North
Case officer
Show
Target decision
20 Nov 2026
Applicant
Show
Agent
Hayat Planning & Design

Decision outlook

Day 59, past the statutory target. 80% of extensions in Walsall are decided within thirteen weeks, which runs to 25 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 593 days past the 56-day target
51%decided within 8 weeks
77%approved
463decided in the last year

Plota live figures for extensions decided by Walsall in the last twelve months, from validation. Walsall decision record →

Consultation & key dates

Consultation
8 Oct 2026
Comments by
22 Oct 2026
Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 overall
Relevant to this application:
Householder decisions

Walsall is slower than most councils at deciding householder applications: #228 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.