War Memorial, Victoria Park, Victoria Road, Darlaston Data via plota.co.uk

26/1226 - Listed Building Consent Registered Application

Proposal

Listed building consent for replacement of memorial plaque. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 22 Oct 2026
Decision
Expected by 17 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Dec 2026 and 31 Dec 2026, from recent listed building consent across the UK.

Site constraints 7

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Conservation area about 10 m away: Darlaston
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Nature improvement area: Birmingham and the Black Country; 1 listed building within 150 m of the postcode pin; Inside the Darlaston built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Listed Building Consent
Received
around 22 Oct 2026
Ward
Bentley and Darlaston North (pre May 2026 ward change)
Case officer
Show
Applicant
Show

Decision outlook

Day 32 of the 56-day target. Councils usually decide listed building consent by day 59.

Day 3227 days to the predicted decision (day 59)
46%decided within 8 weeks
93%approved
29,177decided in the last year

Plota live figures for listed building consent decided across the UK in the last twelve months, from validation; too few recent listed building consent in Walsall to go on. Walsall decision record →

Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 overall
Relevant to this application:
Other decisions

Walsall is slower than most councils at deciding householder applications: #228 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026