Verge Adjacent Magdalene Way, Annesley Road, Hucknall, Nottinghamshire Data via plota.co.uk

V/2026/0736 Pending

Proposal

Works to trees with a tpo Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Nov 2026
Decision
Expected by 12 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 26 Dec 2026, from Ashfield's recent tree and landscaping works.

Site constraints 5

Also on the record
Radon affected area, class 4; 1 listed building within 150 m; Coalfield, development low risk area; Inside the Hucknall built-up area; Flood defence 43 m away (natural high ground, designed for a 1 in 5 year flood).
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ashfield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ashfield
Received
18 Nov 2026
Validated
18 Nov 2026
Ward
Hucknall North
Case officer
Show
Target decision
12 Jan 2027
Applicant
Show

Decision outlook

Day 5 of the 56-day target. Ashfield usually decides tree and landscaping works by day 38.

Day 551 days to the 56-day target
91%decided within 8 weeks
82%approved
38decided in the last year

Plota live figures for tree and landscaping works decided by Ashfield in the last twelve months, from validation. Ashfield decision record →

Ashfield
Planning Authority Score
5.5/10
Average
#118 of 296 overall
Relevant to this application:
Householder decisions

Ashfield is faster than most councils at deciding householder applications: #83 of 296 on speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Ashfield decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #215 of 296
86%
Householder approved
Below avg (90%) #238 of 296
74%
Decided in 8 weeks
Above avg (63%) #83 of 296
34%
Extended time limit
Below avg (41%) #82 of 296
78%
Minor dwellings approved
65 decided (1-9 homes)
88%
Major dwellings approved
16 decided (10+ homes)
72%
Change of use approved
43 decided
425
Total decisions
69 refused in the year to March 2026