The Wide Lane Pavilion, University of Southampton Sports Ground, Wide Lane, Eastleigh, SO50 5PE Data via plota.co.uk

T/26/102436 - TPO Application Valid - Awaiting Decision

Proposal

1no. Sycamore (T134) - Crown lift to 4m. Clear basal vegetation. 1no. Sweet Chestnut (T133) - Crown reduce extended limbs over site by 2-3m. Crown lift to 4m. Remove epicormic growth to 4m. Only undertake works after Bird Nesting season. 1no. Sweet Chestnut ( T132) - Twice extended limb over playing field. Remove broken branch. Crown lift to 4m over site. 1no. Veteran Oak (T128) - Veteranise and Crown reduce x 4 limbs over site by 4m. Crown lift to 4m. Sever Ivy at ground level and strip to 2m and remove section. Clear vegetation. 1no. Oak (T125) - Lateral limb reduction by 3-4m over field to low extended limbs. Crown lift to 4m. Clear vegetation. Sever Ivy at ground level and strip to 2m and remove section. 2no. Ash (T123 & T122) Fell close to ground level. 1no. Oak (T121) - Reduce low extended limbs over site by 3m. Clear vegetation. 1no. Oak (T117) - Reduce by 2m extended limb over site. Sever Ivy at ground level and strip to 2m and remove section. AS PER TREE SURVEY Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Nov 2026
✓
Validated
10 Nov 2026
Decision
Expected by 5 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 22 Dec 2026, from Eastleigh's recent tree and landscaping works.

Comments are open until 11 Dec 2026

Comment on this application ↗

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Public bridleway about 14 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; Priority habitat about 8 m away: Coastal and floodplain grazing marsh.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 19 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastleigh
Application type
TPO
Postcode
SO50 5PE
Received
9 Nov 2026
Validated
10 Nov 2026
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Target decision
5 Jan 2027
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 13 of the 56-day target. Eastleigh usually decides tree and landscaping works by day 42.

Day 1343 days to the 56-day target
97%decided within 8 weeks
92%approved
397decided in the last year

Plota live figures for tree and landscaping works decided by Eastleigh in the last twelve months, from validation. Eastleigh decision record →

Consultation & key dates

Comments by
11 Dec 2026
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 overall
Relevant to this application:
Householder decisions

Eastleigh is faster than most councils at deciding householder applications: #94 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026