South Shore Lodge Brownsea Island BH13 7EE Data via plota.co.uk

P/LBC/2026/03804 - Listed Building Consent Under Officer Consideration

Proposal

Installation of two shower rooms. Demolish modern stud partition wall within one of the downstairs rooms to reinstate back to a large open room. Removal of a timber shed in the curtilage of the property. PVCu rainwater goods on the property to be changed to cast iron. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
22 Jul 2026
Decision
Expected by 16 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 15 Sept 2026, from Dorset's recent demolitions. The consultation period closed on 21 Aug 2026.

Site constraints 11

Special area of conservation: Dorset Heaths
2 designations overlap here. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Grade II listed: South Lodge
List entry 1172349 · 6 m from the pin
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Dorset National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Registered park or garden: Gardens and pleasure grounds at Brownsea (also Branksea) Castle
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Heritage coast: Purbeck
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Sssi
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 247 m away: Poole Harbour SSSI; Nature improvement area: Wild Purbeck; Priority habitat 16 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Listed Building Consent
Postcode
BH13 7EE
Received
22 Jul 2026
Validated
22 Jul 2026
Ward
South East Purbeck Ward
Parish
Studland
Case officer
Show
Applicant
Show
Agent
The National Trust

Decision outlook

Day 54 of the 56-day target. Dorset usually decides demolitions by day 55.

Day 542 days to the 56-day target
66%decided within 8 weeks
93%approved
262decided in the last year

Plota live figures for demolitions decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
21 Aug 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Other decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026