Brownsea Castle Brownsea Island Poole BH13 7EE Data via plota.co.uk

P/LBC/2026/05266 - Listed Building Consent Out To Consultation

Proposal

Removal and replacement of mortar pointing to 3 areas of 1897 brickwork Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
Decision
Expected by 17 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 16 Nov 2026, from Dorset's recent listed building works.

Comments are open until 30 Oct 2026

Comment on this application ↗

Site constraints 12

Grade II listed: Brownsea Castle
List entry 1120277 · The pin is inside its outline · 9 more listed buildings within 150 m (9 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 9 with distances
Historic England ↗
Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Dorset National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Registered park or garden: Gardens and pleasure grounds at Brownsea (also Branksea) Castle
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Heritage coast: Purbeck
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Special area of conservation 20 m away: Dorset Heathlands
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 154 m away: Poole Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Nature improvement area: Wild Purbeck; Priority habitat 23 m away: Lowland dry acid grassland,Lowland heathland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Listed Building Consent
Postcode
BH13 7EE
Received
22 Sept 2026
Validated
22 Sept 2026
Ward
South East Purbeck Ward
Parish
Studland
Case officer
Show
Applicant
Show

Decision outlook

Day 17 of the 56-day target. Dorset usually decides listed building works by day 55.

Day 1739 days to the 56-day target
63%decided within 8 weeks
95%approved
319decided in the last year

Plota live figures for listed building works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
30 Oct 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Other decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026