Land Rear Of 1-3 The Street Hatfield Peverel Essex Data via plota.co.uk

26/02231/FUL Pending Consideration

Proposal

Change of use from Post Office sorting office (Sui Generis) to Class E Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2026
✓
Validated
1 Oct 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 26 Nov 2026, from Braintree's recent changes of use.

The consultation period closed on 27 Oct 2026.

Site constraints 5

Grade II listed: Post Office Stores
List entry 1147129 · 12 m away · 7 more listed buildings within 150 m (1 Grade II*, 6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 7 with distances
Historic England ↗
National infrastructure project 21 m away: A12 Chelmsford to A120 Widening Scheme
The site is 21 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Longfield Solar Farm (decided, 1.7 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Hatfield Peverel built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Braintree
Received
29 Sept 2026
Validated
1 Oct 2026
Target decision
26 Nov 2026

Decision outlook

Day 53 of the 56-day target. Braintree usually decides changes of use by day 56.

Day 533 days to the 56-day target
63%decided within 8 weeks
73%approved
83decided in the last year

Plota live figures for changes of use decided by Braintree in the last twelve months, from validation. Braintree decision record →

Consultation & key dates

Comments by
27 Oct 2026
Statutory expiry
26 Nov 2026
Braintree
Planning Authority Score
7/10
Good
#61 of 296 overall
Relevant to this application:
Change of use

Braintree is faster than most councils at deciding householder applications: #47 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026