Land West Of Bury Lane Hatfield Peverel Essex Data via plota.co.uk

26/02576/OUT Pending Consideration

Proposal

Outline application with all matters reserved except access for up to 88 residential dwellings (including 40% affordable), surface water drainage basin, new vehicular and pedestrian access, public open space, landscaping enhancements, acoustic bund and associated infrastructure works following demolition of existing dwelling. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
✓
Validated
9 Nov 2026
Decision
Expected by 8 Feb 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 3 Jan 2027, from Braintree's recent demolitions.

Comments are open until 1 Dec 2026

Comment on this application ↗

Documents 33

Statements & assessments 20

PDF Transport assessment part 2 Documentation · 5 Nov 2026 View ↗ PDF Landscape and visual impact assessment part 2 Documentation · 5 Nov 2026 View ↗ PDF Design and access statement chapter 2 -3 pgs 14-30 Documentation · 5 Nov 2026 View ↗ PDF Design and access statement chapter 1 pgs 1-11 Documentation · 5 Nov 2026 View ↗ PDF Tree survey Documentation · 5 Nov 2026 View ↗ PDF Biodiversity metric calculation tool Documentation · 5 Nov 2026 View ↗ PDF Design and access statement chapter 4 pgs 34-41 Documentation · 5 Nov 2026 View ↗ PDF Design and access statement chapters 4-5 pgs 48-59 Documentation · 5 Nov 2026 View ↗ PDF Design and access statement chapter 4 pgs 42-47 Documentation · 5 Nov 2026 View ↗ PDF Noise impact assessment Documentation · 5 Nov 2026 View ↗ PDF Air quality assessment Documentation · 5 Nov 2026 View ↗ PDF 01 Existing site survey Drawing · 5 Nov 2026 View ↗ PDF Transport assessment part 1 Documentation · 5 Nov 2026 View ↗ PDF Landscape and visual impact assessment part 1 Documentation · 5 Nov 2026 View ↗ PDF Planning statement Documentation · 5 Nov 2026 View ↗ PDF Statement of community involvement Documentation · 5 Nov 2026 View ↗ PDF Preliminary biodiversity net gain strategy Documentation · 5 Nov 2026 View ↗ PDF Ecological impact assessment Documentation · 5 Nov 2026 View ↗ PDF Flood risk assessment & drainage strategy part 1 (appendices a-e) Documentation · 5 Nov 2026 View ↗ PDF Flood risk assessment & drainage strategy part 2 (appendices f-m) Documentation · 5 Nov 2026 View ↗

All documents on the council site ↗

Site constraints 2

National infrastructure project: A12 Chelmsford to A120 Widening Scheme
The site is inside the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Longfield Solar Farm (decided, 1.2 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Braintree
Received
5 Nov 2026
Validated
9 Nov 2026
Target decision
8 Feb 2027

Decision outlook

Day 14 of the 91-day target. Braintree usually decides demolitions by day 55.

Day 1477 days to the 91-day target
71%decided within 8 weeks
72%approved
59decided in the last year

Plota live figures for demolitions decided by Braintree in the last twelve months, from validation. Braintree decision record →

Consultation & key dates

Comments by
1 Dec 2026
Statutory expiry
8 Feb 2027
Braintree
Planning Authority Score
7/10
Good
#61 of 296 overall
Relevant to this application:
Householder decisions

Braintree is faster than most councils at deciding householder applications: #47 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026