6 Cranstoun Close Totland Totland Bay Isle Of Wight PO39 0JR Data via plota.co.uk

25/00912/TW - Tree Works to TPO Approved

Proposal

T1; Lime (Tilia cordata). Repollard lower sub canopy as marked on picture. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2025
✓
Approved
19 Aug 2025

Approved on 19 Aug 2025 · Planning Officer Delegated Decision · Last checked 23 Oct 2026

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Special protection area 427 m away: Solent and Dorset Coast; National landscape 365 m away: Isle Of Wight; SSSI 424 m away: Headon Warren and West High Down SSSI; 1 listed building within 150 m; Inside the Freshwater and Totland built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area46 m² (495 sq ft)
Energy ratingC (71 out of 100), could reach B
PropertySemi-detached bungalow, 3 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in May 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Isle of Wight - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Works to TPO
Postcode
PO39 0JR
Received
25 Jun 2025
Validated
25 Jun 2025
Ward
Totland And Colwell
Parish
Totland
Case officer
Show
Decision
Granted
Decision date
19 Aug 2025
Decision level
Planning Officer Delegated Decision
Applicant
Show
Agent
Barlow tree surgery

How this decision compares

Decided in 55 days from validation, 7 days slower than Isle of Wight's median of 48 for tree and landscaping works. Approved, as 94% of tree and landscaping works here are.

68%decided within 8 weeks
94%approved
524decided in the last year

Plota live figures for tree and landscaping works decided by Isle of Wight in the last twelve months, from validation. Isle of Wight decision record →

Public comments

No public comments yet.

Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14125533
Planning Portal ref
PP-14125533
Statutory expiry
20 Aug 2025
Env. assessment
No
Isle of Wight
Planning Authority Score
8.9/10
Excellent
#7 of 296 overall
Relevant to this application:
Householder decisions

Isle of Wight is one of the fastest councils in England for householder decisions: #11 of 296 on speed. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Isle of Wight decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #84 of 296
95%
Householder approved
Above avg (90%) #81 of 296
92%
Decided in 8 weeks
Above avg (63%) #11 of 296
15%
Extended time limit
Below avg (41%) #11 of 296
84%
Minor dwellings approved
144 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
94%
Change of use approved
34 decided
792
Total decisions
63 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.