Land at Holbury Manor Park, Park Lane, Holbury Data via plota.co.uk

26/01043SCR - Screening Opinion (EIA) Pending Decision

Proposal

Application for screening opinion under Regulation 6 (schedule 2) of the Town an Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Sept 2026
✓
Validated
24 Sept 2026
Decision
Expected by 30 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 22 Oct 2026, from New Forest (Park)'s recent tree and landscaping works. Comments are open until 9 Oct 2026.

Comment on this application ↗

Site constraints 20

Surface water flood riskSpecial protection areaAerodrome safeguarding zoneFlood zone 3Flood zone 2Unexploded ordnance riskSINCArchaeological interest0054/03
Ancient woodland: Warren Copse
Irreplaceable habitat. Standing advice asks for a 15 m buffer from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Scheduled monument 36 m away: Moated site, fishponds and associated settlement site, 200m west of Holbury Manor
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Ancient Semi Natural Woodland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 119 m away: The New Forest SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Special protection areaCouncil record
Recorded by the council for this site.
Council site ↗
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Flood zone 3Council record
The council's own flood layer for this site.
Council site ↗
Flood zone 2Council record
The council's own flood layer for this site.
Council site ↗
Unexploded ordnance riskCouncil record
Recorded by the council for this site.
Council site ↗
SINCCouncil record
Recorded by the council for this site.
Council site ↗
Archaeological interestCouncil record
Recorded by the council for this site.
Council site ↗
0054/03Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 3; Special area of conservation 429 m away: The New Forest.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Screening Opinion (EIA)
Received
9 Sept 2026
Validated
24 Sept 2026
Parish
Fawley Parish Council
Case officer
Show
Target decision
30 Sept 2026
Applicant
Show

Decision outlook

Day 13 of the 56-day target. New Forest (Park) usually decides tree and landscaping works by day 28.

Day 1343 days to the 56-day target
100%decided within 8 weeks
100%approved
459decided in the last year

Plota live figures for tree and landscaping works decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
By E-mail
Comments by
9 Oct 2026
Statutory expiry
9 Oct 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 councils
Relevant to this application:
Householder decisions

New Forest (Park) is slower than most councils at deciding householder applications, ranking #254 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026