Caravan Storage The Woodlands South Hetton DH6 2RX Data via plota.co.uk

DM/25/01835/FPA - Full Planning Application Pending Consideration

Proposal

Temporary installation of a battery energy storage system, along with ancillary infrastructure, acoustic and security fencing, access, landscaping provision and ecological enhancements (amended site boundary) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Jul 2025
✓
Consultation
12 Nov 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 3 Dec 2026; it is now day 503.

Comments are open until 3 Dec 2026

Comment on this application ↗

Documents 55

Statements & assessments 21

PDF BNG METRIC Supporting Information · 13 Oct 2026 View ↗ PDF ECOLOGICAL IMPACT ASSESSMENT Supporting Information · 23 Sept 2026 View ↗ PDF BNG METRIC CONDITION ASSESSMENTS Supporting Information · 23 Sept 2026 View ↗ PDF BNG METRIC Supporting Information · 23 Sept 2026 View ↗ PDF DRAINAGE DOCUMENTS Supporting Information · 30 Jan 2026 View ↗ PDF DRAINAGE ADDENDUM Supporting Information · 14 Nov 2025 View ↗ PDF PLANNING AND DESIGN & ACCESS STATEMENT Supporting Information · 24 Jul 2025 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT Supporting Information · 8 Jul 2025 View ↗ PDF TIER 1 CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT Supporting Information · 8 Jul 2025 View ↗ PDF ECOLOGICAL IMPACT ASSESSMENT Supporting Information · 8 Jul 2025 View ↗ PDF CONDITION ASSESSMENTS Supporting Information · 8 Jul 2025 View ↗ PDF STATUTORY BIODIVERSITY METRIC CALCULATION TOOL Supporting Information · 8 Jul 2025 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Supporting Information · 8 Jul 2025 View ↗ PDF CULTURAL HERITAGE BASELINE AND IMPACT ASSESSMENT Supporting Information · 8 Jul 2025 View ↗ PDF CULTURAL HERITAGE BASELINE AND IMPACT ASSESSMENT Supporting Information · 8 Jul 2025 View ↗ PDF CULTURAL HERITAGE BASELINE AND IMPACT ASSESSMENT Supporting Information · 8 Jul 2025 View ↗ PDF NOISE IMPACT ASSESSMENT Supporting Information · 8 Jul 2025 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Supporting Information · 8 Jul 2025 View ↗ PDF TOPOGRAPHICAL SURVEY OVERVIEW Supporting Information · 8 Jul 2025 View ↗ PDF TRANSPORT AND ACCESS STATEMENT Supporting Information · 8 Jul 2025 View ↗ PDF AIR QUALITY ASSESSMENT Supporting Information · 8 Jul 2025 View ↗

All documents on the council site ↗

Site constraints 6

Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 184 m away: Hesledon Moor West SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
National infrastructure project: Morven Hawthorn Pit Grid Connection Project, at pre-application; Coalfield, development low risk area; Inside the South Hetton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for battery storage?

Plota Sites searches every land parcel in England and Wales: 9,119 sites fit this search. On and off the market, free to search.

Land for battery storage
Work with planning data?

Every application in Durham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Durham
Application type
Full Planning Application
Postcode
DH6 2RX
Received
8 Jul 2025
Validated
8 Jul 2025
Ward
Murton
Parish
Murton
Case officer
Show
Target decision
18 Dec 2026
Decision level
Committee
Applicant
Show
Agent
Third Revolution Projects

Decision outlook

Day 503, past the statutory target. 76% of full applications in Durham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 50311 days to the predicted decision (day 514)
55%decided within 8 weeks
94%approved
10%go to committee

Plota live figures for full applications decided by Durham in the last twelve months, from validation. Durham decision record →

Public comments

10comments received
9 objecting1 supporting

90% object · above the UK average of 74%

1,010 neighbours consulted · Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14057348
Planning Portal ref
PP-14057348
Neighbours
25 Sept 2026
Consultation
12 Nov 2026
Comments by
3 Dec 2026
Site or press notice
5 Oct 2026
Statutory expiry
7 Oct 2025
Env. assessment
No
Durham
Planning Authority Score
5.2/10
Average
#137 of 296 overall
Relevant to this application:
Householder decisions

Durham is #190 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Durham decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #52 of 296
97%
Householder approved
Above avg (90%) #29 of 296
59%
Decided in 8 weeks
Below avg (63%) #190 of 296
48%
Extended time limit
Above avg (41%) #213 of 296
79%
Minor dwellings approved
95 decided (1-9 homes)
90%
Major dwellings approved
49 decided (10+ homes)
87%
Change of use approved
201 decided
1,706
Total decisions
113 refused in the year to March 2026