Hollman Drive Romsey Hampshire SO51 8ES Data via plota.co.uk

26/02011/TPOS - TREE WORKS WITHIN TPO - SOUTH Approved

Proposal

T1 - T4 and T9 - T17 (TPO.TVBC.1232) - Cyclical repollarding (back to existing knuckles) of 13 Lime trees Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Consultation
16 Sept 2026
✓
Approved
12 Nov 2026

Approved on 12 Nov 2026 · Delegated Decision · Last checked 12 Nov 2026

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
SSSI 60 m away: River Test SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
5 listed buildings within 150 m
Nearest: 47, Mill Lane, Grade II, 52 m away · 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Also on the record
Conservation area 64 m away: Romsey; Inside the Romsey built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Test Valley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
TREE WORKS WITHIN TPO - SOUTH
Postcode
SO51 8ES
Received
15 Sept 2026
Validated
15 Sept 2026
Ward
ROMSEY ABBEY
Parish
ROMSEY TOWN
Case officer
Show
Target decision
10 Nov 2026
Decision
CONSENT subject to conditions and notes
Decision date
12 Nov 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 58 days from validation, 26 days slower than Test Valley's median of 32 for tree and landscaping works. Approved, as 95% of tree and landscaping works here are.

92%decided within 8 weeks
95%approved
703decided in the last year

Plota live figures for tree and landscaping works decided by Test Valley in the last twelve months, from validation. Test Valley decision record →

Public comments

No public comments yet.

Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
16 Sept 2026
Comments by
7 Oct 2026
Statutory expiry
10 Nov 2026
Env. assessment
No
Test Valley
Planning Authority Score
7.8/10
Good
#32 of 296 overall
Relevant to this application:
Householder decisions

Test Valley is faster than most councils at deciding householder applications: #71 of 296 on speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Test Valley decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #68 of 296
96%
Householder approved
Above avg (90%) #62 of 296
76%
Decided in 8 weeks
Above avg (63%) #71 of 296
31%
Extended time limit
Below avg (41%) #61 of 296
70%
Minor dwellings approved
96 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
88%
Change of use approved
50 decided
996
Total decisions
72 refused in the year to March 2026