Land Adjacent Manor Farm Church Lane Howell Sleaford Lincolnshire NG34 9PT Data via plota.co.uk

26/1393/PAR - Part 3 Class R Registered

Proposal

Application for prior notification under schedule 2, part 3, class R for the change of use of an agricultural building to a flexible commercial use Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2026
✓
Consultation
9 Nov 2026
Decision
Expected by 1 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 23 Dec 2026 and 1 Jan 2027, from North Kesteven's recent agricultural works.

Comments are open until 13 Dec 2026

Comment on this application ↗

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 221 m away: Beacon Fen Energy Park
The site is 221 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 101 m away: Churchyard cross, St Oswald's churchyard
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
3 listed buildings within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Part 3 Class R
Postcode
NG34 9PT
Received
6 Nov 2026
Validated
6 Nov 2026
Ward
Kirkby La Thorpe And South Kyme
Parish
Asgarby And Howell
Case officer
Show
Target decision
1 Jan 2027
Applicant
Show
Agent
Brown&Co

Decision outlook

Day 17 of the 56-day target. North Kesteven usually decides agricultural works by day 49.

Day 1739 days to the 56-day target
63%decided within 8 weeks
100%approved
43decided in the last year

Plota live figures for agricultural works decided by North Kesteven in the last twelve months, from validation. North Kesteven decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15327713
Planning Portal ref
PP-15327713
Neighbours
10 Nov 2026
Consultation
9 Nov 2026
Comments by
13 Dec 2026
Site or press notice
19 Nov 2026
Statutory expiry
1 Jan 2027
Env. assessment
No
North Kesteven
Planning Authority Score
6.5/10
Good
#79 of 296 overall
Relevant to this application:
Change of use

North Kesteven is #117 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Kesteven decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #4 of 296
99%
Householder approved
Above avg (90%) #6 of 296
71%
Decided in 8 weeks
Above avg (63%) #117 of 296
45%
Extended time limit
Above avg (41%) #193 of 296
90%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
97%
Change of use approved
36 decided
631
Total decisions
19 refused in the year to March 2026