Rough Wood, Adjacent to 1 Myrtle Close and 43 Oaken Drive Willenhall, WV12 5NS Data via plota.co.uk

26/1320 - Tree Application Registered Application

Proposal

Three Oak and one Birch - crown lift to 6m and prune from property to give 3m clearance. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Nov 2026
Decision
Expected by 6 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 14 Apr 2027 and 21 May 2027, from Walsall's recent tree and landscaping works.

Site constraints 9

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: about 10 m from the postcode pin (reference 398301-086). 2 recorded mine entries within 50 m.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Local nature reserve about 23 m away: Rough Wood Chase
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Nature improvement area: Birmingham and the Black Country; Inside the Willenhall built-up area; Green belt about 23 m away: Birmingham; Priority habitat about 20 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 17 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Tree Application
Postcode
WV12 5NS
Received
12 Nov 2026
Validated
12 Nov 2026
Ward
Short Heath
Case officer
Show
Target decision
6 Jan 2027
Applicant
Show

Decision outlook

Day 11 of the 56-day target. Walsall usually decides tree and landscaping works by day 163.

Day 11152 days to the predicted decision (day 163)
3%decided within 8 weeks
90%approved
115decided in the last year

Plota live figures for tree and landscaping works decided by Walsall in the last twelve months, from validation. Walsall decision record →

Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 overall
Relevant to this application:
Householder decisions

Walsall is slower than most councils at deciding householder applications: #228 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026