19 Brookside Cambridge Cambridgeshire CB2 1JE Data via plota.co.uk

25/1261/TTPO - Works to TPO trees Decided

Proposal

Cedar Lebanon tree no.8 reduce lowest southwest side lateral branch by 4m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2025
✓
Split decision
29 Jan 2026

Split decision on 29 Jan 2026 · Tree - Delegated (CBG) · Last checked 8 Oct 2026

Site constraints 10

New Town And Glisson Road conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Cambridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
15 listed buildings within 150 m
Nearest: Bridge Over Hobson's Brook Opposite Pemberton Terrace, Grade II, 22 m away · 1 Grade II*, 14 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 15 with distances
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Local nature reserve 237 m away: Sheep's Green and Coe Fen
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Scheduled monument 131 m away: Hobson's Conduit
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Registered park or garden 197 m away: Botanic Garden, Cambridge; Tree preservation order 14 m away: Brookside; National infrastructure project 954 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Inside the Cambridge (Cambridge) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,247 m² (13,423 sq ft)
Energy ratingC (asset rating 67)
UseD1 Non-residential Institutions - Education
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in June 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Works to TPO trees
Postcode
CB2 1JE
Received
5 Nov 2025
Validated
5 Nov 2025
Ward
Market
Case officer
Show
Target decision
16 Jan 2026
Decision
Split decision
Decision date
29 Jan 2026
Decision level
Tree - Delegated (CBG)
Applicant
Show

Public comments

No public comments yet.

5 neighbours consulted · Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
31 Dec 2025
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.