Former Fenns Livery And Training Centre Fenns Lane West End Woking Surrey Data via plota.co.uk

26/0963/OOU - Outline Registered

Proposal

Outline planning application for the erection of 5 residential dwellings, provision of access, associated landscaping and parking (all matters reserved other than access). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
✓
Validated
30 Oct 2026
✓
Consultation
9 Nov 2026
Decision
Expected by 25 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 25 Dec 2026, from Surrey Heath's recent new homes.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 6

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 1.1 km away: Southampton to London Pipeline Project
The site is about 1.1 km from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Special protection area about 318 m away: Brentmoor Heath; SSSI about 362 m away: Colony Bog and Bagshot Heath SSSI; Inside the West End and Chobham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Surrey Heath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline
Received
20 Oct 2026
Validated
30 Oct 2026
Ward
Bisley & West End
Parish
West End Parish Council
Case officer
Show
Target decision
25 Dec 2026
Agent
Woolf Bond Planning

Decision outlook

Day 24 of the 56-day target. Surrey Heath usually decides new homes by day 56.

Day 2432 days to the 56-day target
58%decided within 8 weeks
79%approved
36decided in the last year

Plota live figures for new homes decided by Surrey Heath in the last twelve months, from validation. Surrey Heath decision record →

Public comments

No public comments yet.

9 neighbours consulted · Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15238503
Planning Portal ref
PP-15238503
Neighbours
9 Nov 2026
Consultation
9 Nov 2026
Comments by
7 Dec 2026
Statutory expiry
25 Dec 2026
Env. assessment
No
Surrey Heath
Planning Authority Score
4.8/10
Below average
#163 of 296 overall
Relevant to this application:
Major dwellings

Surrey Heath is #134 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Surrey Heath decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #182 of 296
87%
Householder approved
Below avg (90%) #235 of 296
68%
Decided in 8 weeks
Above avg (63%) #134 of 296
34%
Extended time limit
Below avg (41%) #94 of 296
74%
Minor dwellings approved
39 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
95%
Change of use approved
20 decided
600
Total decisions
78 refused in the year to March 2026