Land To The Rear Of 47-51 Great Suffolk Street London SE1 0BS Data via plota.co.uk

26/AP/2480 - Minor application Under consideration/assessment

Proposal

Development of an electric vehicle charging hub - comprising installation of chargepoint upstands, supporting electrical equipment, substation infrastructure, cabinet infrastructure, lighting, CCTV, electrical cabling, customer rest area, replacement overhead canopy, gated access barrier, and ancillary services such as wash, vacuum and tyre air units. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
19 Aug 2026
Validated
27 Aug 2026
Decision
Expected by 21 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 19 Oct 2026 and 12 Nov 2026, from Southwark's recent commercial and major works.

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Bankside and Borough District Town Centre · Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Bankside and The Borough
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Heritage at risk 70 m away: 55, Great Suffolk Street; Conservation area 87 m away: King's Bench; Inside the Southwark built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Minor application
Postcode
SE1 0BS
Received
19 Aug 2026
Validated
27 Aug 2026
Ward
Borough & Bankside
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
21 Oct 2026
Applicant
Show
Agent
Enzygo Ltd

Decision outlook

Day 16 of the 56-day target. Southwark usually decides commercial and major works by day 60.

Day 1644 days to the predicted decision (day 60)
47%decided within 8 weeks
89%approved
100%go to committee

Plota live figures for commercial and major works decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

43 neighbours consulted · Last counted 11 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
21 Oct 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026