25/06088/OBS - Application for obs to adj boroughs Decided

Proposal

Refurbishment and extension of the existing building including: (i) removal of the BMU; (ii) reconfiguration of the sixth floor plant and enclosure to provide an extension in the form of a rooftop pavilion, external amenity space and associated ballustrading; (iii) extension of the lifts to sixth floor level; (iv) installation of green roof at sixth floor level; (v) installation of PV panels at seventh floor level; (vi) facade alterations including installation of vents within existing windows, a revised building entrance on Queen Street, and installation of a gantry rail; (vii) provision of cycle parking, end of trip facilities, and wellbeing space; and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2025
Decision
Target date was 10 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 455.

Site constraints 11

Queen Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Protected view corridor: 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is. Also in the corridor of 6A.1 Blackheath Point to St Paul's Cathedral. Also in the wider setting of 2A.1 Parliament Hill summit to St Paul's Cathedral; 4A.1 Primrose Hill summit to St Paul's Cathedral.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 57 m away: Thames Tideway Tunnel
The site is 57 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 69 m away: Skinners' Hall
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
23 listed buildings within 150 m
Nearest: 4, College Hill Ec4, Grade II, 25 m away · 5 Grade I, 6 Grade II*, 11 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 23 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 14 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area8,117 m² (87,371 sq ft)
Energy ratingC (asset rating 70)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in April 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Application for obs to adj boroughs
Postcode
EC4R 1EB
Received
20 Aug 2025
Validated
20 Aug 2025
Case officer
Show
Target decision
10 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
City of London
Leaseholder
Show

Decision outlook

Day 455, past the statutory target. 84% of other in Westminster are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 13 Nov 2026.

Day 455399 days past the 56-day target
65%decided within 8 weeks
95%approved
2,215decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Westminster to go on. Westminster decision record →

Public comments

No public comments yet.

Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.