Willow Bank Main Road Hirst Courtney North Yorkshire YO8 8QT Data via plota.co.uk

SELZG2026/0501/HPA - Full permission Approved

Proposal

First floor side extension and single storey extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2026
✓
Validated
11 Jun 2026
✓
Consultation
16 Jun 2026
✓
Approved
6 Aug 2026

Approved on 6 Aug 2026 · Chief Planner · Last checked 25 Sept 2026

Site constraints 4

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers and the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 350 m away: Helios Renewable Energy Project
The site is 350 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Thorpe Marsh Gas Pipeline (decided, 1209 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1048 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Open access land 25 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed..
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £300,000 in May 2026. Detached house, freehold.

29 May 2026£300,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Full permission
Postcode
YO8 8QT
Received
29 May 2026
Validated
11 Jun 2026
Ward
Camblesforth & Carlton
Parish
Hirst Courtney
Case officer
Show
Target decision
6 Aug 2026
Decision
Application Permitted
Decision date
6 Aug 2026
Decision level
Chief Planner
Applicant
Show

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 86% of extensions here are.

65%decided within 8 weeks
86%approved
192decided in the last year

Plota live figures for extensions decided by Selby in the last twelve months, from validation. Selby decision record →

Public comments

No public comments yet.

Last counted 25 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
16 Jun 2026
Comments by
7 Aug 2026
Site or press notice
17 Jun 2026
Statutory expiry
6 Aug 2026
Env. assessment
No