West View Main Road Hirst Courtney North Yorkshire YO8 8QT Data via plota.co.uk

26/03467/FUL - Full permission Registered

Proposal

Erection of dwelling following demolition of existing Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2026
✓
Validated
14 Jul 2026
✓
Consultation
30 Jul 2026
Decision
Expected by 8 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 87.

The consultation period closed on 23 Aug 2026.

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 413 m away: Helios Renewable Energy Project
The site is 413 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Thorpe Marsh Gas Pipeline (decided, 1357 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1151 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Priority habitat 12 m away: Deciduous woodland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Full permission
Postcode
YO8 8QT
Received
25 Jun 2026
Validated
14 Jul 2026
Ward
Camblesforth & Carlton
Parish
Hirst Courtney
Case officer
Show
Target decision
8 Sept 2026
Applicant
Show
Agent
Planman

Decision outlook

Day 87, past the statutory target. 86% of demolitions in Selby are decided within thirteen weeks, which runs to 13 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 8731 days past the 56-day target
56%decided within 8 weeks
81%approved
45decided in the last year

Plota live figures for demolitions decided by Selby in the last twelve months, from validation. Selby decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
30 Jul 2026
Comments by
23 Aug 2026
Site or press notice
29 Jul 2026
Statutory expiry
8 Sept 2026
Env. assessment
No

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use