318 Bunyan Court Barbican London EC2Y 8DH Data via plota.co.uk

26/00916/LBC - Listed Building Consent Approved

Proposal

Internal alterations to include removal of non structural bedroom nib wall and installation of new wardrobe and storage space Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2026
✓
Consultation
17 Jul 2026
✓
Approved
2 Sept 2026

Approved on 2 Sept 2026 · Delegated Decision · Last checked 3 Sept 2026

Site constraints 11

Grade II listed: Barbican
List entry 1352667 · The pin is inside its outline · 11 more listed buildings within 150 m (1 Grade II*, 10 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 11 with distances
Historic England ↗
Registered park or garden: The Barbican
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Barbican and Golden Lane conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project 843 m away: Thames Tideway Tunnel
The site is 843 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 574 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 7 m away; Town centre 85 m away: Barbican.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £735,000 in November 2025. Flat or maisonette, leasehold.

14 November 2025£735,000
25 July 2016£775,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area65 m² (700 sq ft)
Energy ratingC (77 out of 100)
PropertyEnclosed mid-terrace flat, 3 habitable rooms
Built1983 to 1990
HeatingCommunity scheme
WallsSystem built, as built, insulated (assumed)

From the energy performance certificate lodged in November 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
EC2Y 8DH
Received
25 Jun 2026
Validated
25 Jun 2026
Ward
Aldersgate
Case officer
Show
Target decision
20 Aug 2026
Decision
Approved
Decision date
2 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Thomson Brothers London Ltd

How this decision compares

Decided in 69 days from validation, about the council's usual 69 days. Approved, as 100% of extensions here are.

30%decided within 8 weeks
100%approved
128decided in the last year

Plota live figures for extensions decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 3 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15037143
Planning Portal ref
PP-15037143
Comments by
18 Aug 2026
Site or press notice
17 Jul 2026
Committee
2 Sept 2026
Statutory expiry
20 Aug 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Other decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.