12 Bank Street, London, E14 4DD Data via plota.co.uk

PA/26/00865/S - Non-material amendment (TCPA S96a) Approved

Proposal

Application for Non-Material amendment to planning permission ref: , Dated 03/05/2024. Non Material amendment(s) Sought: Inclusion of a new condition to allow for the submission and compliance with a revised energy strategy for the building; Revisions to the internal and external fire escape stairs and lifts; Revised roof canopy and plant covering design; Other amendments to the roof and elevations to align with the building's ventilation strategy. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 May 2026
✓
Approved
12 Jun 2026

Approved on 12 Jun 2026 · Delegated · Last checked 6 Sept 2026

Documents 17

All documents on the council site ↗

Associated applications 5

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Canary Wharf. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 174 m away: Thames Tideway Tunnel
The site is 174 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1769 m); London Strategic Heat Main Project (at pre-application, 1958 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Canary Wharf
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
1 listed building within 150 m
Nearest: Quay Walls,copings and Butresses to Import Dock and Export Dock, Grade I, 14 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £8,500,000 in March 2017. Other property, leasehold.

21 March 2017£600,000Recorded as a transfer outside a standard sale. One of 2 sales recorded that day
21 March 2017£8,500,000Recorded as a transfer outside a standard sale. One of 2 sales recorded that day

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area6,645 m² (71,526 sq ft)
Energy ratingB (asset rating 30)
UseC1 Hotels
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendment (TCPA S96a)
Postcode
E14 4DD
Received
15 May 2026
Validated
15 May 2026
Ward
Canary Wharf
Case officer
Show
Target decision
12 Jun 2026
Decision
Permit
Decision date
12 Jun 2026
Decision level
Delegated
Applicant
Show
Agent
DP9
Leaseholder
Show

Consultation & key dates

Statutory expiry
12 Jun 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.