Rooftop Of Gosport Town Hall Town Hall High Street Gosport Hampshire PO12 1EB Data via plota.co.uk

26/00190/FULL - Devt. app. FULL Approved

Proposal

Removal of 6 no. existing antennas and the installation of 6 no. replacement antennas situated on new yoke brackets, and ancillary development including 18 no. remote radio units (rru's) on new rails (conservation area) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Jun 2026
✓
Consultation
11 Jun 2026
✓
Approved
10 Jul 2026

Approved on 10 Jul 2026 · Delegated Decision · Last checked 11 Jul 2026

Documents 23

Other documents 17

PDF HEALTH CORNERSTONE COMMUNITY INFORMATION SHEET Supporting Document · 11 Jun 2026 View ↗ PDF 5G MOBILE TECHNOLOGY: A GUIDE Supporting Document · 11 Jun 2026 View ↗ PDF LOCAL AUTHORITY TOOLKIT 5G & HEALTH Supporting Document · 11 Jun 2026 View ↗ PDF 5G MASTS & HEALTH Supporting Document · 11 Jun 2026 View ↗ PDF PLANNING FOR A BETTER NETWORK CORNERSTONE COMMUNITY INFORMATION SHEET Supporting Document · 11 Jun 2026 View ↗ PDF RADIO PLANNING AND PROPAGATION (V.4 NOVEMBER 2019) Supporting Document · 11 Jun 2026 View ↗ PDF 5G SERVICES CORNERSTONE COMMUNITY INFORMATION SHEET Supporting Document · 11 Jun 2026 View ↗ PDF ALLAYING HEALTH CONCERNS REGARDING 5G AND EXPOSURE TO RADIO WAVES (2ND ED.) Supporting Document · 11 Jun 2026 View ↗ PDF COVERAGE AND CAPACITY CORNERSTONE COMMUNITY INFORMATION SHEET Supporting Document · 11 Jun 2026 View ↗ PDF COVERING LETTER Supporting Document · 11 Jun 2026 View ↗ PDF CLARIFICATION OF THE DECLARATION OF ICNIRP COMPLIANCE Supporting Document · 11 Jun 2026 View ↗ PDF COLLABORATING FOR DIGITAL CONNECTIVITY Supporting Document · 11 Jun 2026 View ↗ PDF THE PUBLIC BENEFIT OF MOBILE CONNECTIVITY Supporting Document · 11 Jun 2026 View ↗ PDF LETTER TO COUNCIL LEADERS/CHIEF EXECUTIVES - SUPPORTING DIGITAL INFRASTRUCTURE D Supporting Document · 11 Jun 2026 View ↗ PDF SAFETY GUIDELINES ON ELECTROMAGNETIC FIELDS FROM ANTENNAS CORNERSTONE COMMUNITY INFORMATION SHEET Supporting Document · 11 Jun 2026 View ↗ PDF GENERAL BACKGROUND INFORMATION FOR TELECOMMUNICATIONS DEVELOPMENT Supporting Document · 11 Jun 2026 View ↗ PDF 5G, EMF EXPOSURE AND SAFETY Supporting Document · 11 Jun 2026 View ↗

All documents on the council site ↗

Site constraints 9

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
High Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Heritage at risk: High Steet, Gosport
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Special protection area about 156 m away: Portsmouth Harbour
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 156 m away: Portsmouth Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
9 listed buildings within 150 m of the postcode pin; Inside the Gosport built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gosport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gosport
Application type
Devt. app. FULL
Postcode
PO12 1EB
Received
11 Jun 2026
Validated
11 Jun 2026
Ward
Harbourside And Town
Case officer
Show
Target decision
6 Aug 2026
Decision
Grant Permission
Decision date
10 Jul 2026
Decision level
Delegated Decision
Agent
Clarke Telecom Limited

How this decision compares

Decided in 29 days from validation, 21 days faster than Gosport's median of 50 for listed building works. Approved, as 100% of listed building works here are.

85%decided within 8 weeks
100%approved
12%go to committee

Plota live figures for listed building works decided by Gosport in the last twelve months, from validation. Gosport decision record →

Consultation & key dates

Alt. reference
PP-14990385
Planning Portal ref
PP-14990385
Neighbours
11 Jun 2026
Consultation
11 Jun 2026
Comments by
9 Jul 2026
Site or press notice
18 Jun 2026
Statutory expiry
6 Aug 2026
Env. assessment
No
Gosport
Planning Authority Score
8.3/10
Excellent
#19 of 296 councils
Relevant to this application:
Householder decisions

Gosport is faster than most councils at deciding householder applications, ranking #66 out of 296. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Gosport decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #38 of 296
97%
Householder approved
Above avg (90%) #32 of 296
76%
Decided in 8 weeks
Above avg (63%) #66 of 296
30%
Extended time limit
Below avg (41%) #54 of 296
67%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
85%
Change of use approved
13 decided
226
Total decisions
13 refused in the year to March 2026