Battery energy storage system at 301 Grendon Road, Earls Barton, Northampton
Summary of planning committee decision
Decided by North Northamptonshire Planning Committee on 11 Mar 2026.
What was proposed
A battery energy storage facility of up to 99.9 megawatts was proposed, with battery units, power equipment, fire-water storage, drainage, landscaping, CCTV and fencing.
“Construction and operation of a Battery Energy Storage System (BESS) and associated infrastructure with fire water storage tank and pumphouse, landscaping, attenuation pond, CCTV cameras and fencing.”
“- 22 battery units and power conversion system units. - Compound with external plant. - Water tank. - Welfare container. - Water hydrant. - Fire water pump hose. - Spare parts container. - Aux transformer. - DNO control room. - Switchgear building. - Gates and fencing. - CCTV columns. - Lighting column. - Hardstanding. - Attenuation pond. - Drainage. - Landscaping.”
Officer report
The site and surroundings
The five-hectare agricultural site lies south of Earls Barton, beside the A45 and a closed recycling centre, with fields, woodland and the River Nene nearby.
“The application site is located to the south of the village of Earls Barton, to the south side of the A45 and to the east of a recycling centre. The recycling centre is currently closed. Access to the site is proposed off Station Road. The access track would be extended round to the proposed site. Further east are agricultural fields. To the south lies fields and woodland with the River Nene beyond. To the west is Station Road with a transport service business.”
Officer report
Earlier applications nearby
Earlier applications covered environmental-impact screening and battery storage schemes nearby, including one implemented scheme and another not yet built.
“NW/25/00271/SCR Environmental Impact Assessment screening opinion request for a proposed battery energy storage system (BESS) and associated infrastructure. Decision: Not Environmental Impact development. Decision Issued 16.06.2025”
“NW/23/00360/FUL Development of battery energy storage system (BESS) with associated infrastructure including access, drainage and landscaping (updated layout and updated EIA information received January 2025) at Grendon Lakes Main Road Grendon Northampton NN7 1JW. Decision: Permitted 29 th July 2025 Status: Development not implemented.”
Officer report
What officers recommended
Officers recommended approval because the scheme would support energy management and low-carbon energy, with impacts considered acceptable subject to conditions.
“The benefits of the scheme rest mainly with the sustainability benefits relating to energy management in accordance with paragraph 8 of the Framework. Whilst there are impacts on the landscape and minor negative impact from loss of farmland, there would be significant environmental benefits arising from the proposal which supports the renewable energy sector in balancing power demands.”
“It is recommended that the application is GRANTED subject to conditions as set out below with delegated authority to the Assistant Director for Planning to approve any amendments to those conditions as deemed necessary.”
Officer report
What consultees said
Most consultees raised no objection subject to conditions, including on highways, landscape, ecology, fire safety, drainage, heritage and contamination.
“The submitted Landscape Visual Assessment includes an assessment on landscape value and landscape sensitivity. The Landscape Visual Assessment considers the overall landscape sensitivity to be ‘low,’ primarily owed to the influence of existing development and road infrastructure and well enclosed by vegetation. The NNC Landscape Officer does not disagree with this stance but improvements to the details of the Landscape Plan is recommended.”
“Second response (No objections) The new ‘issue 3’ outline battery safety management plan have addressed the points and queries raised. It includes confirmation that water connections are available at different points across the site and that the layout has two accesses which take account of the prevailing wind direction. A swept path analysis for fire vehicles has also been provided.”
Officer report
Objections and concerns
The parish council, residents and a ward councillor objected over fire, contamination, wildlife, agricultural land, flooding, traffic, consultation and cumulative development.
“Earls Barton Parish Council (Objection) The location close to a Site of Special Scientific Interest (SSSI) and a Ramsar site. Should there be an occasion when the Battery Energy Storage System is subject to leakage through damage, fire or flooding, the contamination to the SSSI and the Ramsar site could be catastrophic. In addition, there has only been a six-month survey of wintering birds in this area when the minimum required is a survey of two years.”
“This is not an electricity generating proposal and it is not required considering that other schemes in the local area have already been approved, one of which is built. Furthermore, there is an outstanding Nationally Significant Infrastructure Project around Grendon and 8 other villages which comprises of 3000 acres of solar farm and includes a 60-acre Battery Energy Storage System. The proposal will result in cumulative excess.”
Officer report
Who spoke
The planning officer presented the report, and the applicant’s representative spoke about energy storage, improving safety and the growing renewable-energy grid.
Members’ debate
Members questioned flood risk, runoff, fire effects on the A45, highways drainage, the recycling centre, monitoring, Green Hill Solar Farm and safety measures.
“Clarity was sought on how a fire could affect the A45 which was a much-used road through the county. The officer clarified that there was a very low risk of fire, and it was not known how it would affect the road as it would depend on the prevailing wind and the extent of the fire. There had been no objections received from National Highways.”
“It was noted that there was a Recycling Centre shown next to the site and the officer was asked what the impact could be. The officer clarified that this was currently not operational and had been closed for some time but could re-open in the future. • It was noted that there was CCTV, and it was confirmed that there was a control room that remotely monitored activity and any issues would be highlighted. There was active fire suppression at the site.”
Minutes
The vote
The motion to grant permission received ten votes in favour and one against.
“The chair, for the purpose of debate and in accordance with the council’s constitution meeting procedure rules 19.2 and 19.21, moved the recommendation that planning permission be granted subject to the conditions within the report. This was seconded by Councillor Bone.”
“The debate concluded and the chair put the motion to the vote. There were 10 votes in favour of the application and one vote against. The motion was therefore declared carried.”
Minutes
The committee’s decision
Planning permission was granted subject to the conditions in the report, with members finding no material planning reasons to refuse despite continuing concerns.
“Members commented and considered that there were no material planning reasons to refuse the application, they remained concerned about the potential for a fire to start and noted the mitigation that was in place. Concern was expressed about any issues creating traffic movement problems on the A45 but accepted that improvements to technology had been put in place.”
Minutes
The members' reasons
“Members still considered that the ‘runoff’ was of concern and there could be contamination.”
Minutes
Source: the council's minutes, quoted word for word.
Councillors at the meeting
- Chris KellettChairReform UK
- Jennie BoneReform UK
- David BrackenburyConservative
- Paul BrookeReform UK
- William ColquhounLabour
- Gordon DunsmuirReform UK
- Maurice EglinReform UK
- Ash HallReform UK
- Frank KilgallonReform UK
- Denis McLeanReform UK
- James TownsGreen
- Ben WilliamsGreen
Apologies Helen Howell Conservative
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- North Northamptonshire Planning Committee minutes, 11 March 2026
- Agenda and papers (council website)
Source: Plota analysis of North Northamptonshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Council
- North Northamptonshire
- Date
- Wednesday 11 March 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- 10 for, 1 against
- Councillors
- 12Reform UK 8Green 2Conservative 1Labour 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- North Northamptonshire committee decisions →
Source: Plota analysis of the minutes.
This committee's year
25 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.