Land adjoining Croft Gate Farm Stoke Prior Leominster Herefordshire Data via plota.co.uk

P251098/XA2 - PP - Approval of details reserved by condition Decided

Proposal

Application for approval of details reserved by conditions 3 & 4 attached to planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Apr 2025
✓
Split Decision
28 May 2025

Split Decision on 28 May 2025 · Last checked 14 Oct 2026

Associated applications 4

Site constraints 6

Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Traditional orchards
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Priority habitat 4 m away: Traditional orchard; Inside the Stoke Prior (Herefordshire) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
PP - Approval of details reserved by condition
Received
2 Apr 2025
Validated
2 Apr 2025
Ward
Hampton
Parish
Ford and Stoke Prior
Target decision
28 May 2025
Decision
Split Decision
Decision date
28 May 2025

Consultation & key dates

Consultation
4 Apr 2025
Site or press notice
4 Apr 2025
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 overall
Relevant to this application:
Major dwellings

Herefordshire is slower than most councils at deciding householder applications: #250 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026