14 North Common Road Ealing W5 2QB Data via plota.co.uk

263105HH - Householder Pending Consideration

Proposal

Installation Of Air Source Heat Pump And Air Conditioning Condenser In Rear Garden Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Aug 2026
✓
Consultation
28 Sept 2026
Decision
Expected by 9 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision soon after comments close on 28 Oct 2026, from Ealing's recent utility and infrastructure works.

Comments are open until 28 Oct 2026

Comment on this application ↗

Site constraints 8

Ealing Common conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
2 listed buildings within 150 m; Inside the Ealing built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Metropolitan Open Land 34 m away; Priority habitat 28 m away: Deciduous woodland; Open access land 29 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed..
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £1,700,000 in February 2009. Detached house, freehold.

27 February 2009£1,700,000
25 October 2005£1,650,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Householder
Postcode
W5 2QB
Received
14 Aug 2026
Validated
14 Aug 2026
Ward
Ealing Common
Case officer
Show
Target decision
9 Oct 2026
Applicant
Show
Agent
Manu Design Limited

Decision outlook

Day 56 of the 56-day target. Ealing usually decides utility and infrastructure works by day 61.

Day 5620 days to the predicted decision (day 76)
42%decided within 8 weeks
88%approved
68decided in the last year

Plota live figures for utility and infrastructure works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15159150
Planning Portal ref
PP-15159150
Consultation
28 Sept 2026
Comments by
28 Oct 2026
Site or press notice
7 Oct 2026
Statutory expiry
9 Oct 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use