Solar and renewables in Ealing

Ealing received 44 renewable energy applications in the last 12 months, including 15 heat pumps. Of the 28 decided so far, 23 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

5
|
0
|
0
Get alerts for Ealing

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 5 of 5 applications
14 Aug 2026 Pending Consideration 263105HH

14 North Common Road Ealing W5 2QB

Installation Of Air Source Heat Pump And Air Conditioning Condenser In Rear Garden

Householder Ealing
6 Aug 2026 Pending Consideration 263026FUL

48 Creswick Road Acton W3 9HF

Erection of 2 new three-storey 4 bedroom semi-detached dwellinghouse (Class C3) (following demolition of existing dwellinghouse (Class C3), associated...

Full Application Ealing
27 Jul 2026 Approved 21 Sep 262562CND

Kingsley House Lynton Avenue West Ealing W13 0EA

Details noise assessment report of external noise sources pursuant to condition 7 of planning permission ref 251648FUL dated 10/12/2025 for: Construct...

Discharge Condition Ealing
21 Jul 2026 Pending Consideration 262844FUL

214 And 216 Pitshanger Lane Ealing W5 1QG

Conversion of two adjoining dwellinghouses into a single family dwellinghouse; associated alterations, replacement windows and doors; rear dormer wind...

Full Application Ealing
15 Jul 2026 Pending Consideration 262554FUL

34 Woodfield Road Ealing W5 1SH

Installation of 3 x air source heat pumps at roof level to serve each flat at first and second floor levels (Retrospective).

Full Application Ealing
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Ealing

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Ealing?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Ealing. You can also narrow the alert to a postcode, street, or drawn area.

We check Ealing's planning portal daily. New solar & renewables applications appear here within a day of being published.