The Vicarage 30 Lincoln Road Tuxford Nottinghamshire NG22 0HP Data via plota.co.uk

26/01495/CAT - Works to Trees in a Conservation Area Awaiting decision

Proposal

Carry Out Works to Trees Within a Conservation Area - (G1) 8 Poplars - Fell to Ground Level, (T1) Sycamore - Fell to Ground Level, (T2) Elder - Fell to Ground Level, (T3) Elder - Fell to Ground Level. (T4) Hazel Tree - Crown Lift and Prune Back Lower Branches to Clear Garage by 2m, (T5) Sycamore Tree - Fell to Ground Level, (T6-T13) 2 Elder and 6 Sycamore - Fell to Ground Level Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Nov 2026
✓
Consultation
18 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Dec 2026 and 6 Jan 2027, from Bassetlaw's recent tree and landscaping works.

Comments are open until 9 Dec 2026

Comment on this application ↗

Site constraints 6

Tuxford conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
2 listed buildings within 150 m; Coalfield, development low risk area; National infrastructure project 464 m away: H2East Pipeline: Humber to Nottinghamshire, at pre-application; Inside the Tuxford built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area198 m² (2,131 sq ft)
Energy ratingE (51 out of 100), could reach C
PropertyDetached house, 8 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, oil
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in May 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bassetlaw - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bassetlaw
Application type
Works to Trees in a Conservation Area
Postcode
NG22 0HP
Received
17 Nov 2026
Validated
17 Nov 2026
Ward
Tuxford And Trent
Parish
Tuxford (Town Council)
Case officer
Show
Target decision
29 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Groveside Tree Specialists

Decision outlook

Day 6 of the 56-day target. Bassetlaw usually decides tree and landscaping works by day 46.

Day 650 days to the 56-day target
70%decided within 8 weeks
95%approved
186decided in the last year

Plota live figures for tree and landscaping works decided by Bassetlaw in the last twelve months, from validation. Bassetlaw decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15375972
Planning Portal ref
PP-15375972
Consultation
18 Nov 2026
Comments by
9 Dec 2026
Statutory expiry
29 Dec 2026
Env. assessment
No
Bassetlaw
Planning Authority Score
1.2/10
Poor
#286 of 296 overall
Relevant to this application:
Other decisions

Bassetlaw is one of the slowest councils in England for householder decisions: #291 of 296 on speed. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bassetlaw decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #203 of 296
89%
Householder approved
Below avg (90%) #199 of 296
25%
Decided in 8 weeks
Below avg (63%) #291 of 296
73%
Extended time limit
Above avg (41%) #289 of 296
68%
Minor dwellings approved
77 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
78%
Change of use approved
45 decided
575
Total decisions
87 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.