Land at Kiln Park, Haven Holiday Park, Marsh Road, Tenby, Pembrokeshire, SA70 7RA Data via plota.co.uk

NP/25/0606/FUL - Full Approved

Proposal

The proposed installation of a telecommunications base station comprising a 23.1 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Consultation
21 Nov 2025
✓
Received
16 Sept 2026
✓
Approved
7 Oct 2026

Approved on 7 Oct 2026 · Delegated · Last checked 7 Oct 2026

Site constraints 16

LDP Coastal Risk AreaTechnical Advice Note 15_c2Ancient Monument - within 500mRecreation Character AreasAffordable Housing SubmarketsSeascape Character AreasLandscape Character AreaDale
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Pembrokeshire Coast National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Scheduled monument 51 m away: Black Rock Quarry Lime Kilns
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
LDP Coastal Risk AreaCouncil record
Recorded by the council for this site.
Council site ↗
Technical Advice Note 15_c2Council record
Recorded by the council for this site.
Council site ↗
Ancient Monument - within 500mCouncil record
Recorded by the council for this site.
Council site ↗
Recreation Character AreasCouncil record
Recorded by the council for this site.
Council site ↗
Affordable Housing SubmarketsCouncil record
Recorded by the council for this site.
Council site ↗
Seascape Character AreasCouncil record
Recorded by the council for this site.
Council site ↗
Landscape Character AreaCouncil record
Recorded by the council for this site.
Council site ↗
DaleCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
2 listed buildings within 150 m; SSSI 292 m away: Lydstep Head to Tenby Burrows; National infrastructure project: Gwynt Glas Offshore Wind Farm, at pre-application.

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Pembroke Coast - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
SA70 7RA
Received
16 Sept 2026
Validated
16 Sept 2026
Ward
W05001489
Parish
Tenby
Case officer
Show
Target decision
10 Nov 2026
Decision date
7 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Perry

How this decision compares

Decided in 21 days from validation, 34 days faster than Pembroke Coast's median of 55 for full applications. Approved, as 89% of full applications here are.

57%decided within 8 weeks
89%approved
185decided in the last year

Plota live figures for full applications decided by Pembroke Coast in the last twelve months, from validation. Pembroke Coast decision record →

Consultation & key dates

Alt. reference
PP-14434461
Site or press notice
21 Nov 2025
Committee
3 Dec 2025