Coppice Farm, Pen-Rhos, Llanymynech, SY22 6QB Data via plota.co.uk

P/26/0779/FUL - Full planning permission Under Consultation

Proposal

Proposed ground mounted solar PV panels, substation, switch room and all associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Aug 2026
Decision
Expected by 30 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 7 Nov 2026, from Powys's recent utility and infrastructure works.

Site constraints 2

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Full planning permission
Postcode
SY22 6QB
Received
5 Aug 2026
Validated
5 Aug 2026
Ward
Llandrinio
Parish
Llandrinio
Case officer
Show
Target decision
30 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Freehold owner
Show

Decision outlook

Day 65 of the 56-day target. Powys usually decides utility and infrastructure works by day 75.

Day 6510 days to the predicted decision (day 75)
38%decided within 8 weeks
88%approved
8%go to committee

Plota live figures for utility and infrastructure works decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

8comments received
8 neutral

Last counted 7 Oct 2026

Read the comments on the council site ↗